Wiory, Poland
Built
2005
Warsaw water district
|
Waterpumps WP Oy has delivered hydropower
equipment for Wiory power plant in Poland. The work included three
tube turbines with hydraulics and control panels. All the equipment
was assembled ready for mounting in Finland. The customer fitted
the units in to the plant and tested the equipment. Commissioning
was done with the presence of WP Oy’s personnel.

|
<< Back to references
|
|

One of the delivered tube turbines is ready for mounting
on
the draft tube flange.
Water ways are closed with butterfly valves. Actuator
works with hydraulic power pack and gravity is used for
closing energy.
|
|
|